Permanent routing
SAL Aerospace
Every THY RFQ, quote, order, communication, and evidence record stays with SAL Aerospace.
0929-THY · Governed Workflow Position
Permanent routing
SAL Aerospace
Every THY RFQ, quote, order, communication, and evidence record stays with SAL Aerospace.
The145 intake
Manual only
No scraping, autonomous extraction, or unattended import is permitted.
Decision authority
Human gated
Approval, release, sending, sealing, logistics, and shipment remain human-controlled.
Data boundary
THY isolated
Standalone tenant scope remains separated from the Part 145 master module.
ORVEX
Aviation
Engineering the future
0929-AVI-THY-RFQ-DETAIL
Standalone Controlled RFQ Journey
THY-260729-018
High riskTechnical ReviewBlocker door fairing
Structural repair evaluation quote
Customer
Turkish Technic
Customer due
Jul 30, 2026
Current lane
Technical Review
Next authority
Structures Engineering
Single selected record
GATE 01
THY Program Intake
Part, scope, customer deadline, and supplied package normalized.
Immutable evidence reference
EV-THY-260729-018-INTAKE-001
GATE 02
Structures Engineering
Trace evidence and CMM/SRM applicability remain unresolved.
Immutable evidence reference
EV-THY-260729-018-TECHNICAL-001
GATE 03
Commercial Authority
Pricing cannot be approved before the technical hold is closed.
Immutable evidence reference
EV-THY-260729-018-COMMERCIAL-001
GATE 04
SAL Aerospace Order Control
Customer order receipt and SAL order placement remain fail-closed.
Immutable evidence reference
EV-THY-260729-018-ORDER-001
Controlled evidence summary
Intake
Complete with trace discrepancy
Technical status
Hold — missing trace evidence
Approved-data basis
CMM/SRM applicability review required
Commercial status
Blocked pending technical disposition
Proposed price
$18,750 planning value
Margin
34% planning value
Warranty
12 months repair
Turnaround
15–20 business days subject to material
Required next action
Authorized engineering must disposition the trace discrepancy and confirm the approved repair-data path before quote approval.
Append-only history
Jul 30 · 07:18
Structures Engineering
Technical evidence hold applied
Missing trace documentation recorded against the RFQ package.
Jul 29 · 16:42
THY Program Intake
RFQ normalized
Customer scope, part identity, and deadline recorded.
Jul 29 · 15:55
Customer Package
RFQ received
Initial technical documents attached to controlled demonstration record.
Continue selected journey
Demonstration records only. Production use requires standalone THY tenant persistence, server-side role and record authorization, immutable audit storage, approved technical-data controls, and validated human approval workflows.